Hanover Airport / Apron floodlighting

aeroplan
2011 – 2014, Hanover Airport (Germany) Project Measurement of the Illumination levels of the existing floodlighting Analysis of inconsistences towards actual ICAO and DIN standards Planning of the LED floodlighting for Terminal A to D and GAT 25 Lightpoles, thereof 12...
Read More

Leipzig-Halle Airport / Apron 3

aeroplan
2010 – 2012, Leipzig-Halle Airport (Germany) Project Power- and emergency power supply Transformer vault Data cables in copper and fiber optic Taxiway and Apron lighting Taxiway signage in LED Obstacle lights Apron Floodlighting Power distribution 400Hz Ground power supply CCTV Waist...
Read More

Hamad International Airport

aeroplan
2005 – 2012, Doha (Qatar) Project Hamad International Airport (General Desing and Project by Bechtel Overseas) Mandate Consultant for Qatar Airways in the field of: Power- and Erergency Power Supply Visual Aids Advanced surface movement guidance and control system Floodlighting...
Read More

Geneva International Airport

aeroplan
2005 – 2011, Geneva (Switzerland) Project Runway23/05, ICAO CAT III and taxiways Refurbishment of runway and taxiway lighting Power supply and distribution Emergency power supply Mandate Project and site surveillance for electrical equipment and visual ground aids. Coordination with civil engineering. :In...
Read More

Engadin Airport

aeroplan
2011, Samedan (Switzerland) Project Runway 03/21 Precision Approach Path Indicator (PAPI 03 and PAPI 21, 4,4°) Control and monitoring Mandate Project, on site inspections, calibration Client Engadin Airport Cost CHF 100’000.- Challenges Highes airport in Europe, Threshold altitude 1707m/5600ft Off-set apprach in...
Read More

Frankfurt / Runway 07L – 25R, CAT III

aeroplan

Runway 07L-25R, 2800x45m
CAT III either direction
Content:
-Visual aids
-Approach- and Runway lighting
-Taxiway Lighting and signage
-Control and Monitoring
-Power supply of the NAVAIDS
-Power supply of the weather sensors

Read More

Lugano Airport / Lead in Lights

aeroplan
2004 – 2009, Lugano Agno (Switzerland) Project Runway 01/19 Lead in lights 01 Circling lights on runway 19 Mandate 2004: Feasibility studie 2004: Design and evaluation on the SAAB2000 flight simulator 2009: Obstacle lights 2010: Realization of lead in lights 19 Client...
Read More

Melville Hall Airport

aeroplan
2009, Melville Hall (Commonwealth of Dominica) Project Runway 09/27, ICAO non instrument Runway and taxiway lighting PAPI Implementation Signage Emengecy power supply Control and monitoring LEMP protection of the Towerbuilding Floodlighting Client Dorsch Consult GmbH Cost EUR 35 million Challenges Work...
Read More

Frankfurt / De-icing pads

aeroplan

De-icing pads DP2
Expansion of the remote control and monitoring system
Introduction of A-SMGCS capabilities
Taxiway and deicing pad lighting with addressable lamp switches
Installation of the CCR’s with lamp switch master
Taxiway and deicingpad signage by means of LED lighted signs
Obstruction lights

Read More

Bern-Belp Airport

aeroplan
1999 – 2008, Bern-Belp Airport (Switzerland) Project Runway 14/32, ICAO CAT I. Runway and taxiway lighting Runway and Apron extension Replacement ILS 14, Shelter Mandate Project and site surveillance for electrical equpment and visual ground aids. Coordination with civil engineering. Client ALPAR...
Read More