2005 – 2008, Bern-Belp, Grenchen, Les Eplatures and St.Gallen-Altenrhein (Switzerland)

Project
Meteorologische Equipment
Replacement and extension of weather instruments
Ceilometer
Forwardscatter (RVR-metering)
Anemometer
Integration in MMI’s Tower

Mandate
General project coordination
Electrical installations and on site management

Client
BBL – Federal Construction Departement and Logistics Departement

Cost
CHF 2 million

Challenges
Integration in existing systems