Project
De-icing pads DP2
Expansion of the remote control and monitoring system
Introduction of A-SMGCS capabilities
Taxiway and deicing pad lighting with addressable lamp switches
Installation of the CCR’s with lamp switch master
Taxiway and deicingpad signage by means of LED lighted signs
Obstruction lights
De-icing pads DP2
Expansion of the remote control and monitoring system
Introduction of A-SMGCS capabilities
Taxiway and deicing pad lighting with addressable lamp switches
Installation of the CCR’s with lamp switch master
Taxiway and deicingpad signage by means of LED lighted signs
Obstruction lights
Mandate
Project and site surveillance for electrical equipment and visual ground aids. Coordination with civil engineering.
Conduction of the setting into service
Training for mainenance staff
In joint cooperation with Dorsch International